[3D Printing Tutorial] Ultimaker S5 Pro Bundle New Machine Unboxing and Setup!
I. Ultimaker S5 Pro Bundle Main Equipment


(1) Lid
(2) Filter Housing
(3) Filter
(4) Handle
(5) Pressure Buffer
(6) Device Mounting Bracket
(7) Fan
(8) Device Hinge
(9) Cable
(10) UMB OUT Port

(1) Glass Door
(2) Print Head
(3) Build Plate
(4) Build Plate Clamps
(5) Touchscreen
(6) USB Port
(7) Feeder
(8) Bowden Tube
(9) Feeder
(10) Power Socket
(11) Ethernet Port
(12) Spool Holder
(13) NFC Port

(1) Glass Door
(2) Spool Bays
(3) Filament Inlets
(4) Filament Outlet
(5) UMB IN Port
(6) UMB OUT Port
(7) Desiccant Exhaust Vent
(8) Adaptive Couplers
(9) Power Supply
II. Installation and Use
Choose a flat surface that can support the weight (approximately 50 kg) of the Ultimaker S5 Pro Bundle 3D printer, and lift and install it with at least two people.
.Installing the Ultimaker S5 3D Printer

1. First, open the Ultimaker S5 packaging and remove all accessories from inside the 3D printer.
2. Remove the clips from the device and insert the Bowden tube.
3. Secure the Bowden tube with the clips.

4. Route the 3D print cable into the Bowden tube.
5. Open the glass door and plate clamps.
6. Place the glass plate into the build platform and close the glass door.
.Installing the Air Manager
Please power off your Ultimaker S5 3D printer before proceeding with the installation.

1. Align the mounting bracket with the back of the Ultimaker S5.
2. Install the feeder tube and print head cable into the slots (feeder tube in front).
3. Gently press the bracket until it clicks firmly into place.

4. Align the bottom of the filter housing with the slots in the mounting bracket and push it into place.
5. Push the filter into the filter housing.
6. Place the cover over the filter housing from the front of the 3D printer.

7. Align the latch with the mounting bracket and click it into place.
8. Connect the Air Manager power cable to the port on the back.
9. Combine the clip secured to the mounting bracket with the Air Manager power cable.

10. Slide the clip upwards to secure the cable.
11. Place the Air Manager cable to the right of the spool holder and insert it into the UMB OUT port on the back of the Ultimaker S5.
12. Use the cable clips to connect the Air Manager cable with the Ultimaker S5's NFC cable.
.First-time installation steps:
1. Start the Ultimaker S5 3D printer.
2. Use the Ultimaker S5 touchscreen to select the installation of the latest device: Air Manager.
(The Ultimaker S5 touchscreen interface will guide you through all the steps.)
*The Air Manager will only start when you power on your Ultimaker S5 3D printer.
.Installing the Material Station
The Material Station is recommended to be stored at a temperature of 15-32°C (59 – 90°C). When in use, please place the device in a cool area away from direct sunlight, and ensure at least 10 cm of space behind the Material Station for air circulation.
The Material Station is recommended to be stored at a temperature of 15-32°C (59 – 90°C). When in use, please place the device in a cool area away from direct sunlight, and ensure at least 10 cm of space behind the Material Station for air circulation.

1. Place the Ultimaker S5 on top of the Material Station. At least two people are needed to lift the Ultimaker S5 3D printer during installation.
2. Insert the feeder tube clamp into each feeder of the Ultimaker S5.
3. Insert the left Bowden tube into the corresponding left feeder, and the right Bowden tube into the corresponding right feeder.

4. Secure the Bowden tube with the clamps.
5. Insert the spool holder cover into the Ultimaker S5 connection port.
6. Connect the Material Station cable to the UMB IN port on the back of the device (at the same time, connect the Air Manager cable to the UMB IN port on the back of the Material Station).

7. Insert the connection cable into the UMB OUT port on the back of the Ultimaker S5.
8. Connect the Material Station to the Ultimaker S5 using the power extension cable.
9. Connect the power cable to the Material Station and the other end to the power outlet.
The Material Station can effectively control space humidity. When loading filament, please avoid leaving the glass door open for extended periods. Before starting 3D printing, please ensure the glass door is completely closed.
.First-time installation steps:
3. Start the Ultimaker S5 3D printer.
4. Use the Ultimaker S5 touchscreen to select the installation of the latest device: Material Station.
(The Ultimaker S5 touchscreen interface will guide you through all the steps.)
*The Material Station will only start when you power on your Ultimaker S5 3D printer.
.Ultimaker S5 Pro Bundle 3D Printer - Device Connection Ports

1. UMB OUT port connecting the "Air Manager" and the "Material Station".
2. One end of the cable connects to the UMB IN port of the "Material Station", and the other end connects to the UMB OUT port of the "Ultimaker S5 3D Printer".
3. Connect the power extension cable between the "Ultimaker S5 3D Printer" and the "Material Station".
4. Connect the power cable to the "Material Station" and the other end to the "power outlet".
Has this introduction helped you understand the equipment better? Contact us immediately to learn more about the Ultimaker 3D printer, and feel free to follow 3DMart's Facebook page and YouTube channel to stay updated on the latest 3D printing news.
Has this introduction helped you understand the equipment better? Contact us immediately to learn more about the Ultimaker 3D printer, and feel free to follow 3DMart's Facebook page and YouTube channel to stay updated on the latest 3D printing news.